Paying for a Bulk Packaging Order: Terms, Inspection and Claims

Unit price is the number buyers negotiate hardest, and the payment structure decides whether that price actually protects them. A low unit cost with full payment in advance carries more risk than a slightly higher price on 30/70 terms with an inspection before the balance. This guide covers the standard structure, each stage, and what to do when goods arrive wrong.

Key takeaways

  • The common structure is 30 per cent deposit with the order, 70 per cent against the bill of lading.
  • Sampling at 7 to 10 days and bulk production at 20 to 35 days sit between the two payments.
  • The deposit covers raw material; the balance is your only leverage, so inspect before you release it.
  • Paying against a bill of lading copy means the goods are already on the water.
  • Put the inspection standard, the AQL levels and the claim window in the purchase order, not in email threads.

The standard 30/70 structure

Most factories quote 30 per cent with the order and 70 per cent against shipping documents. The two milestones sit on either side of production, and what happens between them is the point.

StageWhat happensTypical payment
Order confirmationSpecification and artwork approved, proforma invoice signed30 per cent deposit
SamplingPre-production sample made and couriered for approvalCovered by the deposit
Bulk productionFabric, printing, stitching and packingBalance not yet due
Pre-shipment inspectionCheck against the approved sample and the specificationInspection fee, buyer side
ShipmentGoods handed to the forwarder, bill of lading issued70 per cent balance
ArrivalCartons checked against the packing listClaim window as agreed

Why the deposit exists

Factories buy fabric and burn print screens against a confirmed order, so the deposit covers that material commitment. It is also the point at which your specification becomes binding: a deposit paid against an approved sample is harder to reinterpret than a verbal order. Expect it to be non-refundable once material is cut, stated in writing.

What 70 per cent against the bill of lading means

The bill of lading is the transport document proving the goods were handed to the carrier. Suppliers usually ask for the balance against a copy, which means the containers are loaded and the vessel has sailed. That is normal practice, but it moves your last chance to check earlier, into the inspection window.

  • Against a bill of lading copy: you pay after shipment. Fast, and the usual arrangement on repeat orders.
  • Against telex release: the supplier releases cargo to your forwarder at destination once payment clears.
  • Against a full original set: the documents travel by courier, so you hold the goods until you release them. Most control, slowest route.
  • Letter of credit: the bank pays against documents, which protects both sides but adds charges and paperwork.

The inspection window is the point

If the balance is released against shipment, the pre-shipment inspection is your one structured chance to catch a problem while the supplier still holds the goods.

  1. Confirm the standard in writing: the approved sample, the specification sheet and the AQL levels.
  2. Book the inspection before the production completion date, not after it.
  3. Check quantity, carton count and carton markings against the packing list.
  4. Check the bag itself against the sample: size, fabric weight, handle attachment, print position and colour.
  5. Photograph every defect with the carton label in frame; a photo without a carton reference is hard to action.
  6. Get the report before releasing the balance, and put any hold in writing to the supplier and the forwarder.

AQL in plain terms

AQL means acceptable quality limit: the defect rate a batch may contain and still pass. Defined in ISO 2859-1, it is applied as a sampling plan with a set number of units pulled from the cartons and a maximum number of defects per class.

Defect classTypical AQLExamples
Critical0Metal fragment in the fabric, wrong product in the carton
Major2.5Broken stitching at the handle, print missing or misregistered, wrong size
Minor4.0Loose thread, slight shade variation, a small mark inside the bag

Levels are agreed per order, not fixed by law. For promotional giveaways, 4.0 major is often accepted to hold cost down; for retail packaging on a shelf, 1.5 or 2.5 is more usual. Write the choice into the purchase order.

When the goods arrive wrong

Problems usually fall into four groups: short quantity, wrong specification, quality below the approved sample, and transit damage. Each has a different remedy, and the first hours after unloading decide how much you can prove.

  • Photograph the cartons before opening, then the contents, with the label visible.
  • Count or weigh a sample of cartons rather than the whole load.
  • Notify the supplier in writing inside the claim window agreed in the contract.
  • Separate transit damage from production defects: the forwarder and insurer handle the first, the supplier the second.
  • Agree the remedy ladder in advance: replacement in the next run, credit against the next order, or a price adjustment.

What belongs in the purchase order

  • Specification with tolerances: size, fabric weight, print colours and packing method.
  • Approved sample reference, signed and dated by both sides.
  • Payment schedule with the exact trigger for each instalment.
  • Inspection standard, AQL levels and who pays for the inspection.
  • Claim window, evidence requirements and the remedy options.
  • Incoterm and named port, so risk transfer is unambiguous.

Where to start

On a first order, ask for the payment schedule and the inspection terms in the same message as the quote. A supplier who will not put a claim window or an AQL level in writing is telling you how the order will go. Minimum orders typically start at 500 pieces per design, with sampling at 7 to 10 days and bulk production at 20 to 35 days.

Send your specification through our contact form, read the FAQ on sampling and lead times, or see what to include in an RFQ and our packaging sourcing guide.

Frequently asked questions

Is 30/70 the only payment structure?

No. Fifty-fifty, 20/80 and letter of credit arrangements are all common. First orders with a new supplier often need a higher deposit or an L/C, which usually eases after a few smooth shipments.

Who pays for the pre-shipment inspection?

The buyer normally pays, and third-party inspection companies charge per man-day plus travel. It is a small cost against a container, and it is the only check made while the supplier still controls the goods.

What is a reasonable claim window?

Seven days from arrival is common for visible defects, with a longer period for faults that only appear in use. Whatever you agree, put it in the purchase order and photograph cartons on arrival.

What if the sample is good but the bulk is not?

The approved, sealed sample is the standard. Keep a signed copy, inspect against it before the balance, and write the AQL levels into the order so the inspector has a measurable pass or fail.

Do I need a letter of credit for a first order?

Not always. Below a certain order value the bank charges outweigh the protection. Above it, an L/C at sight is a reasonable way to protect both sides when there is no trading history yet.

Part of our guide collection: Packaging sourcing and compliance.

Published 28 November 2026 · how we produce and check our content